Exeter · Family home
Complete Bathroom Renovation
A cramped, dated bathroom redesigned for better use of space, then fully renovated from strip-out to final coat.
- Project value
- £12,000
- Duration
- 4 weeks
- Property
- Family home, Exeter
- Trades coordinated
- Plumbing, electrics, tiling, plastering, decorating
What the client wanted
A bathroom that worked properly for a family, with more usable storage, a better layout, and finishes that would last.
The challenge
The original layout wasted a good third of the floor area and there was nowhere to store anything. Moving the plumbing was the only way to fix it properly.
How we solved it
Rather than replacing like for like, we redesigned the layout first. Moving two runs of pipework freed up enough space for a proper shower and built-in storage, in the same footprint.
What we did
- Strip-out of the existing bathroom
- Plumbing alterations to change the layout
- New shower tray and sanitaryware
- Wall and floor tiling
- New lighting and electrical work
- Built-in shelving and storage
- Plastering, decorating and finishing
Before and after
Same angle, before the work started and after it finished.




During the work
What it looked like partway through. Most companies never show you this part.



The finished project


The client had one company managing the entire project from start to finish.